© 2025 Campion Mechanical & Electrical Engineering Limited | All Rights Reserved
Terms | Privacy | Compliances
Campion Pumps delivers reliable water tanker services across Ireland, supporting utilities, contractors, and commercial operators with both planned supply and emergency response.
From short-term outages to long-duration infrastructure failures, our teams ensure continuity of water supply with rapid deployment, operational flexibility, and full compliance with Irish Water standards.
Campion’s water tanker division operates across two core areas: planned water supply and emergency response.
For construction, commercial, and infrastructure projects, Campion provides scheduled tanker services to support ongoing operations.
Typical use cases include:
Capacities range from smaller 30,000 litre deliveries for residential or site testing requirements to large-scale supply of 500,000 to 1,000,000 litres for commercial applications. These services are commonly used where systems must be commissioned, tested, or maintained before going live.
Campion specialises in rapid response tanker deployment for unplanned events.
Typical emergency scenarios include:
Tanker capacities range from 1,000 to 30,000 litres, with the ability to mobilise at short notice and scale operations depending on demand.
Campion is an approved contractor to Irish Water and operates across designated emergency response locations nationwide.
Campion’s tanker services are designed to ensure uninterrupted supply, even in high-pressure situations.
Crews can mobilise quickly, often at very short notice, with standby arrangements in place during periods of high risk such as severe weather events.
For larger incidents, tanker fleets operate on rotation, maintaining constant replenishment of reservoirs and storage systems.
Operations can run around the clock to ensure end users are not impacted.
In addition to bulk water supply, Campion can provide:
Most emergency deployments are short-term, typically lasting one to three days, though major incidents can extend over several weeks or months.
An island water treatment plant experienced a major failure, leaving it unable to supply potable drinking water to the local community. With repairs expected to take approximately eight weeks, there was an immediate risk of prolonged water outage.
Campion was mobilised to provide a continuous emergency water supply solution. The response included:
Operations were structured to ensure an uninterrupted service, with tankers cycling between source and storage points.
Although initially expected to last eight weeks, the project extended to approximately three months due to the scale of the issue. Throughout this period:
Despite a complete failure of the primary treatment plant, the residents experienced no loss of water supply. The project demonstrated:
With decades of experience supporting Ireland’s water infrastructure, Campion combines operational readiness with practical expertise. Whether responding to emergencies or supporting planned works, the focus remains the same:
Deliver water where it is needed, when it is needed, without disruption.
© 2025 Campion Mechanical & Electrical Engineering Limited | All Rights Reserved
Terms | Privacy | Compliances